I need to create pipework from my new garage to the nearby drain (as indicated by building control officer).
The inspection pit is concrete sections with clay pipe at a depth of one metre. Is it accepted practice to break into the pit with a hammer and chisel? If so, at what depth? What diameter pipe to use? and any other info please.
