Bathroom Pipework Issues During Modifying Bathroom

by Rockabilly » Mon Aug 22, 2016 11:20 am

Hi, I am currently modifying our bathroom.
I have removed the shower unit and sink and I'm replacing with bath and new sink.
My problem is the pipework!
I have a 15 mm feed off the mains that fed to feed the shower which I've capped off.
I have a 15mm hot feed from boiler for the sink and a 15mm cold from a tank in loft that is cold supply for sink and toilet.
Now can I use the mains supply to feed sink, toilet and bath?
Therefore get rid of tank in loft?
Can I tee off the hot supply to feed bath?

Any advice very much appreciated.
Cheers Craig

lets have a look
Foreman
Foreman
Posts: 213
Joined: Sun Mar 20, 2016 7:59 am

Re: Bathroom Pipework Issues During Modifying Bathroom

by lets have a look » Mon Aug 22, 2016 6:33 pm

Depends if you have a combi boiler

Rockabilly
Labourer
Labourer
Posts: 3
Joined: Mon Aug 22, 2016 11:01 am

Re: Bathroom Pipework Issues During Modifying Bathroom

by Rockabilly » Tue Aug 23, 2016 12:21 am

Sorry yes combie boiler

lets have a look
Foreman
Foreman
Posts: 213
Joined: Sun Mar 20, 2016 7:59 am

Re: Bathroom Pipework Issues During Modifying Bathroom

by lets have a look » Tue Aug 23, 2016 6:17 pm

Yes you can connect the bathroom to the cold mains and tee off the 15mm hot pipe for the bath

Rockabilly
Labourer
Labourer
Posts: 3
Joined: Mon Aug 22, 2016 11:01 am

Re: Bathroom Pipework Issues During Modifying Bathroom

by Rockabilly » Tue Aug 23, 2016 7:04 pm

Great... Thank you