Build up Footings Base for Garden Retaining Wall


Postby DanJJJJJJ » Sun Sep 10, 2017 4:25 pm

Hi all, first post here :)

I have dug a trench to build a retaining wall in my garden that is being raised up to serve as a veg patch. It's on quite a slope, up about 4 foot over 4 metres.

I dug one of the downward sloping trenches level all the way through. I know realise this was stupid as I have been hacking away layers of chalk so I should have stepped it.

Anyway, is it OK to fill the trench back in, maybe halfway down, about a foot and half deep with soil / chalk, compress, and then poor footings onto this? There is currently a layer of sheer chalk.

Also, could anyone give any tips on providing drainage to the downward sloped end of the retaining wall? If I install those black semi-porous drainage pipes would I run them through the footings (encase in concrete) or through the retaining (brick) wall?

Sorry is that doesn't make sense - hope it does.

Thank you, Dan
DanJJJJJJ
Rank: Labourer
Progress to next rank:
0%
Posts: 1
Joined: Sun Sep 10, 2017 4:17 pm

Sponsor

Simply Build It


  • DIY How to Project Guides

  • DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!



 


  • Related Topics