Postby maggimatchbox » Sat Apr 04, 2009 2:54 pm

I have laid a 60 mm concrete slab, there is a slight bump of 8 mm and some slight crazing. I have been back to the seller of the concrete and have been told that as the crazing is 1mm or less I do not need to worry. I will be employing someone to lay the levelling screed, will that cover the bump and cracks or will they work their way through to the top. I intend to lay flooring which requires a very smooth top layer.
Any help would be appreciated
Rank: Labourer
Progress to next rank:
Posts: 1
Joined: Sat Apr 04, 2009 2:38 pm


Simply Build It

Postby rosebery » Mon Apr 06, 2009 9:52 pm

Probably chop the bump out before levelling. At least thats what I'd do.

Rank: Project Manager
Posts: 2022
Joined: Wed Sep 26, 2007 8:55 pm

Display posts from previous
Sort by
Order by

  • DIY How to Project Guides

  • DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!


  • Related Topics