Emersion re-siteing
All aspects of plumbing questions and answers, help, tips and information

8 posts   •   Page 1 of 1
Karlos
Apprentice
Apprentice
Posts: 5
Joined: Tue May 13, 2008 11:27 pm

Emersion re-siteing

by Karlos » Tue May 13, 2008 11:33 pm

[color=red][b] I am thinking of moving my emersion heater from the kitchen to the bathroom up stairs will expect any problems with presure and what size pipe should i use plastic or copper :?: [/b]

nitro23456
Foreman
Foreman
Posts: 346
Joined: Sun Aug 12, 2007 7:19 pm

by nitro23456 » Wed May 14, 2008 9:45 am

I use copper.

htg engineer
Project Manager
Project Manager
Posts: 3256
Joined: Tue May 22, 2007 6:22 pm

by htg engineer » Wed May 14, 2008 8:31 pm

Is this a tank, only heated by the immersion ?
or is it heated by a boiler too ?

The hot water draw off, normally 22mm copper
mains cold water 15mm copper.
If it's connected to a boiler, 28mm copper.
You also need to install an overflow, normally 22mm plastic.

What does the immersion supply hot water to ? just the kitchen ? (as the bathroom is upstairs) ?

htg

Karlos
Apprentice
Apprentice
Posts: 5
Joined: Tue May 13, 2008 11:27 pm

by Karlos » Wed May 14, 2008 10:52 pm

[quote="htg engineer"]Is this a tank, only heated by the immersion ?
or is it heated by a boiler too ?

The hot water draw off, normally 22mm copper
mains cold water 15mm copper.
If it's connected to a boiler, 28mm copper.
You also need to install an overflow, normally 22mm plastic.

What does the immersion supply hot water to ? just the kitchen ? (as the bathroom is upstairs) ?

htg[/quote]the tank is only heated by the immersion and will provide hot water for both kitchen and bathroom as it does now. I am re-siteing to make way for eyeleval oven there is plent of room behind the bath tub to put an airing cubboard and house the tank .

Karlos
Apprentice
Apprentice
Posts: 5
Joined: Tue May 13, 2008 11:27 pm

by Karlos » Wed May 14, 2008 10:57 pm

:!: The tank is only heated by the immersion and provides hot water for both kitchen and bathroom. i am re-siteing be hind the bath tub to make way for eye level oven

plumbbob
Project Manager
Project Manager
Posts: 1892
Joined: Wed May 07, 2008 10:59 pm

by plumbbob » Thu May 15, 2008 8:28 am

Normally on a low pressure system, feeds to sinks and basins are 15mm and the 22mm to a bath. The existing pie sizes should give you a good clue as to what are required.

Just be aware, the electrical work needs, under the new regulations, to be done by a qualified electrician.

chris_on_tour2002
Project Manager
Project Manager
Posts: 1024
Joined: Thu Aug 30, 2007 10:14 pm

by chris_on_tour2002 » Thu May 15, 2008 11:16 am

do you intend to feed from the main or from a tank in the loft? if mains then should be no problem with pressure. if it was feeding the bathroom before with no problem then it should in theory work better if you move it upstairs.

Karlos
Apprentice
Apprentice
Posts: 5
Joined: Tue May 13, 2008 11:27 pm

by Karlos » Sun May 18, 2008 8:04 pm

Hey thanks guys :)

8 posts   •   Page 1 of 1
It is currently Fri Apr 19, 2024 9:18 pm