Excavation depth for concrete floor?


Postby Urchin » Wed Sep 09, 2009 8:45 am

Hi there

Our building regs inspector has told us to use the following for out concrete floor

6 inches of hardcore, "then whacker it"
2 inches of sand "then whacker it"
Insulation (we have bought 100mm)
Damproof
4 inch concrete
3 inches screed. (my husband says this sounds like too much screed though? is 3 inches right?)

How much can we expect the hardcore to compress?

What is the total depth we need to excavate?


Thanks!
Urchin
Posts: 10
Joined: Thu Jun 04, 2009 7:15 pm

Sponsor

Simply Build It

Postby stoneyboy » Sun Sep 13, 2009 8:55 pm

Urchin,
You'll need to dig out 20" below FFL and if the BI says 3" screed and you want BR approval thats what you must lay.
Your hardcore should be crushed (no large pieces eg bricks) and it will compress about 20% with the wacker plate but this will depend on how loose it is when tipped.