Flow and return from solid fuel stove

Postby david60 » Thu Oct 06, 2011 1:22 pm

My question is about the flow and return in a primary circuit from a multifuel back boiler in a gravity system connected to an indirect cylinder. As I understand it,the run should not exceed six meters. My proposed installation does exceed this distance and I would like advise on how to remedy this safely.
Is the length measured from the cylinder or the heat sink rad?
The flow and return pipes do rise vertically to the ceiling, thereafter it will be necessary to have horizontal pipe run to the rad and cylinder.
Thanking you in anticipation. David
Rank: Labourer
Progress to next rank:
Posts: 3
Joined: Mon Jul 18, 2011 6:13 pm


Simply Build It

  • DIY How to Project Guides

  • DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!


  • Related Topics