how to finish patio above DPC

Postby Kevindrich » Tue May 10, 2011 9:37 pm

Hi all

My property is on two different levels, I am building two patios with steps leading to the two hights. The problem is the top patio will finish 600mm above the DPC of the lower extension. The extension extends out about 900mm for the main house so the top patio will run into the side wall. How would I finish this, at the moment there is a 400mm gap between the extension and original top patio. This drop is a potential risk to my kids falling down it. I have read about lead flashing being used chased into the brickwork, would this work or do I have to live with a gap. Any help and advise on how to finish this top patio with out causing damp issues.
Rank: Labourer
Progress to next rank:
Posts: 3
Joined: Sun Jul 25, 2010 9:29 am


Simply Build It

Postby welsh brickie » Wed May 11, 2011 8:10 pm

I would fit an aco drainage system,Its a preformed gully system that directs surface water away from your property.
welsh brickie
Rank: Project Manager
Posts: 2198
Joined: Sat Apr 12, 2008 7:54 am

Display posts from previous
Sort by
Order by

  • DIY How to Project Guides

  • DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!


  • Related Topics