how to finish patio above DPC


Postby Kevindrich » Tue May 10, 2011 9:37 pm

Hi all

My property is on two different levels, I am building two patios with steps leading to the two hights. The problem is the top patio will finish 600mm above the DPC of the lower extension. The extension extends out about 900mm for the main house so the top patio will run into the side wall. How would I finish this, at the moment there is a 400mm gap between the extension and original top patio. This drop is a potential risk to my kids falling down it. I have read about lead flashing being used chased into the brickwork, would this work or do I have to live with a gap. Any help and advise on how to finish this top patio with out causing damp issues.
Kevindrich
Posts: 3
Joined: Sun Jul 25, 2010 9:29 am

Sponsor

Simply Build It

Postby welsh brickie » Wed May 11, 2011 8:10 pm

I would fit an aco drainage system,Its a preformed gully system that directs surface water away from your property.
welsh brickie
Posts: 1886
Joined: Sat Apr 12, 2008 7:54 am


Display posts from previous
Sort by
Order by


 


  • Related Topics