Is screed on slab compulsory


Postby LAB » Tue Aug 28, 2012 5:50 pm

Hi
Having to connect Soil pipes to existing clay I am restricted as to the height adjustment on a house extension, a meter or two would reach the height of the Insulation, a brickie friend has adviced me to forget the screed and float/trowel finish with 125mm concrete, would the BI allow this or would no harm in part of pipe within the Insulation? help please
LAB
Posts: 19
Joined: Wed Apr 18, 2012 4:32 pm

Sponsor

Simply Build It

Postby welsh brickie » Wed Aug 29, 2012 5:51 pm

screed is not complusory, the screed is to level the floor to existing floor,as the concrete slab is not usually laid accuratly.
The B.I has to inspect the floor before the slab is laid anyway, to check the insulation,harcore compaction,and visqueen is laid correctly.So you can ask him before the pour.
welsh brickie
Posts: 1891
Joined: Sat Apr 12, 2008 7:54 am


Postby LAB » Wed Aug 29, 2012 7:51 pm

Thanks again Welsh Brickie
Diolch
LAB
Posts: 19
Joined: Wed Apr 18, 2012 4:32 pm