Laying a sharp sand screed as a kitchen floor


Postby Russell Hasleden » Sat Apr 14, 2007 2:16 pm

My existing kitchen floor has been removed becaused it was very badly installed. To be able to lay a new screed one end has 75mm the other has 125mm. Can I lay a screed to different levels? Also how long would it be before I can walk and lay a laminate floor down.

Regards

Russell
Russell Hasleden
Posts: 2
Joined: Sat Apr 14, 2007 2:07 pm

Sponsor

Simply Build It

Postby thedoctor » Sat Apr 14, 2007 5:46 pm

You can lay the screed at different levels Russell but for strength it may be best to put a lightweight aggregate in the mix. Talk to your local builders merchants about lightweight aggregate.
thedoctor
Site Admin
Posts: 2200
Joined: Sat Apr 08, 2006 12:15 pm


Postby Russell Hasleden » Sat Apr 14, 2007 9:53 pm

Thanks, I know drying times vary, how long would I have to wait before laying laminate on top of the screed.

Regards

Russell
Russell Hasleden
Posts: 2
Joined: Sat Apr 14, 2007 2:07 pm


Postby thedoctor » Sun Apr 15, 2007 8:09 am

About 10 days in a normally heated house Russell
thedoctor
Site Admin
Posts: 2200
Joined: Sat Apr 08, 2006 12:15 pm