LEVEL ACCESS FROM THE PATIO


Postby m7ohn » Mon Oct 29, 2007 3:35 pm

I WOULD LIKE TO CREATE A LEVEL ACCESS FROM MY PATIO TO MY BACK DOOR.
I HAVE A LOW THRESHOLD BACK DOOR AND I UNDERSTAND I CAN SATISFY PART M OF THE BUILDING REGS BY USING A DOOR THRESHOLD CHANNEL DRAIN ACROSS THE DOOR OPENING.
I WOULD LIKE THE WHOLE PATIO TO BE LEVEL WITH MY BACK DOOR NOT JUST THE AREA LEADING TO MY BACK DOOR.
WILL THIS BE ALLOWED USING A LINEAR CHANNEL DRAIN RIGHT ACROSS THE LENGTH OF THE BUILDING OR DO I HAVE TO COMPLY WITH THE 150MM BELOW DPC LEVEL TO FINISHED GROUND LEVEL RULE?

THANKS IN ADVANCE FOR ANY REPLYS

MARCUS
m7ohn
Posts: 37
Joined: Wed May 30, 2007 8:30 pm

Sponsor

Simply Build It

Postby jk » Sun Nov 25, 2007 6:08 pm

did you ever clarify the level access issue regarding edge drains?
jk
Posts: 1
Joined: Sun Nov 25, 2007 6:01 pm