raised edging stone and sharp sand


Postby keith mac » Fri Apr 03, 2009 9:34 am

firstly, I had my drive and path block paved 2 years ago.. The job was ok but not perfect. The edging kerbs were left too high I wanted them to stick up by about 1cm but they are at least 6 cm above the block work. This makes cutting grass a difficult task.. How can i lower them my self without creating too much of a disturbance to the rest of the drive, Also after powerwashing the bricks I have washed the sand from the joints approx how much sand is required per SQ MTR to re sand the joints.

thanks
keith mac
Posts: 1
Joined: Fri Apr 03, 2009 9:29 am

Sponsor

Simply Build It

Postby elwood » Fri Apr 03, 2009 7:36 pm

Hi

It would be much easier to raise your lawn around the drive and feather the levels in to the existing then turf or have a planted border around the drive


Taking out and relaying the kerb sett would be very difficult and probably
look bodged.

Bye
elwood
Posts: 84
Joined: Sun Jan 18, 2009 9:31 pm