bathroom Vent Pipes for new Bathroom Build


Postby robert10185 » Tue May 08, 2018 5:22 am

I am building a bathroom in my room addition,my drain pipes are all running together. I have a shower , tub, double vanity and a toilet. There is a 3 inch vent pipe behind the toilet drain and a 2 inch vent pipe off the shower drain.Do I need to run a vent pipe for the tub and vanity or will the two I have work for the whole system?
robert10185
Rank: Labourer
Progress to next rank:
0%
Posts: 1
Joined: Tue May 08, 2018 4:52 am

Sponsor

Simply Build It

Postby RoyalBathrooms » Thu Jun 28, 2018 11:37 am

I think the 3 inch pipe is enough for both drainage system. The 3 inch vent pipe can hold all the wastes and can easily move it to the waste area.
RoyalBathrooms
Rank: Labourer
Progress to next rank:
25%
Posts: 2
Joined: Tue Jun 12, 2018 9:50 am

Display posts from previous
Sort by
Order by



  • DIY How to Project Guides

  • DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!



 


  • Related Topics