Could someone tell me if this is typical please? I’m looking to remodel a house and have been quoted £1500 for a measured building survey, £2400 to go through the concept design (RIBA stage 2) and £2400 to go through the developed design (RIBA stage 3). To pay over £6000 to see if the project is viable is making me wonder whether the purchase is feasible. The budget altogether is between £40k-£50k Thanks for any advice.
Seems fair, but I think it depends where you are and what you're doing. I've been told my site is very complex by many an architect so my costs are far higher than yours. Best to tender to a number of architects.
DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!