Could someone tell me if this is typical please? I’m looking to remodel a house and have been quoted £1500 for a measured building survey, £2400 to go through the concept design (RIBA stage 2) and £2400 to go through the developed design (RIBA stage 3). To pay over £6000 to see if the project is viable is making me wonder whether the purchase is feasible. The budget altogether is between £40k-£50k Thanks for any advice.
DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!