Hi, I'm a DIY'er and currently doing a loft convertion on my bungalow. Have installed new floor joists and completed roof insulation, Building regs compliant. Before I start erecting stud walls I need to know if the flooring should go down first or the stud walls go directly on top of new floor joists? I assume that the flooring should be done after I have erected stud wall frames and have completed elect and plumbing first fixes? Any advice?
DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!