Building regulations state a soil stack ventilation pipe open to air should finish at least 900mm above any opening into the building within 3m. Does a roof ventilation tile connected to a bathroom exhaust vent extractor constitute an opening into the building? The position of the vent tile is in the bottom third of the roof. Thanks.
DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!