My gas Ariston A30MFF1 boiler has a 15mm water supply pipe to it

Is this big enough?

Behind the 15mm cold supply pipe valve to the boiler there is a copper elbow. On this elbow a 10 or 12mm stub has been soldered or brazed

Is that a standard fitting and will it be strong enough for cold water pressures?

The stub then has a valve and the filling loop on it.

Many thanks for any help
midknight
Posts: 17
Joined: Wed Sep 10, 2008 8:28 am

Sponsor

Simply Build It

Postby Steve the gas » Thu Nov 27, 2008 5:33 am

Hi,

Yes and yes it should be ok as its just for the filling loop
Steve the gas
Posts: 780
Joined: Sun May 04, 2008 7:07 am


Postby midknight » Thu Nov 27, 2008 9:58 am

Many thanks.

I was never able to vent the air from the heat exchanger. When opening the vent by up to half a turn nothing happens. The pressure on the gauge is over 1 bar so I would expect fluid. It may be blocked.

I know the original installer must have done it but the manual says to vent again after a period of use.