Concrete Slab with footings advice needed please


Postby dunny1234 » Tue Nov 22, 2011 6:45 pm

I'm preparing ground for concrete slab. I've now dug my slab area (10m x 6m), and 225mm deep footings around the perimeter and up the centre as recommended by structural engineer (where timber frame panels will be).

I've started to lay my sub-base (803), next will be a layer of sand. After this i plan to construct my formwork around the perimeter, lay my DPM, place steel mesh and then pour concrete.

I think i'm doing this the correct way? Any advice would be gratefully received? Really want it to be right before the scary pour of concrete

Thanks in advance
dunny1234
Posts: 8
Joined: Mon Sep 26, 2011 10:00 pm

Sponsor

Simply Build It

Postby welsh brickie » Wed Nov 23, 2011 7:27 am

you will have to contact the building control officer before you proceed to pour the concrete.He is the best person to advise you
welsh brickie
Posts: 1970
Joined: Sat Apr 12, 2008 7:54 am


Postby bob2012 » Tue Feb 14, 2012 10:22 am

If you’re having problems calculating how much concrete you need, Google "tarmac.co.uk/concretecalculator"
It works quite good on my moby as well.
- Bob
bob2012
Posts: 1
Joined: Tue Feb 14, 2012 10:17 am