DIY Doctor

Conservatory base built delay on frames

Postby TuThis » Sat Dec 05, 2020 3:14 pm

Hi

Just found this website so need some advice if you can.

We have had a conservatory base built 7m width 3.5 depth, its all been completed, I dont know much but base was laid, then some gravel and then concreted over.

The dwarf walls have a gap in between where insulation was inserted, the floor had this inulation as well but it was like huge pads.

Black membrane on the ground etc all seems ok as far as what I can see,

They are a big company but one thing that im wondering is...

Frames/glass can be delayed until January and everything is getting we.

Now is this not an issues and the floor is concrete and the insulation in the walls has been covered, just that the water is gathering, I keep sweeping it out which is fine OR do I have anything to worry about with this delay.

Thanks
TuThis


Sponsor

Simply Build It

Postby stoneyboy » Tue Dec 08, 2020 9:58 pm

Hi tuthis
Probably nothing to worry about just continue to remove accumulated rainwater.
Regards S
stoneyboy
Rank: Project Manager
Posts: 4377
Joined: Wed Dec 10, 2008 6:44 pm



Display posts from previous
Sort by
Order by



  • DIY How to Project Guides
  • DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!


 
  • Related Topics

cron