My concrete slab is already done. I have a DPM under it. This is what it looks like now the shuttering is off.
The concrete got between the DPC and shuttering. I will putting a DPC on the slab edge under the floor plate. What should I do about the edge of the slab?
Hi vitessesteve You really need to take your cladding down the sides of the floor slab to prevent water ingress. You could fit a wider DPC under the floor plate, take this down the edge of the slab and cover with cladding. Regards S
DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!