I want to run joists from the left hand wall to the right hand wall, to put a floor on to use as a storage area.
The plan was to use the existing beam (LHS) - which runs alongside the existing flint wall - with joist hangers at 90 degrees carrying the joist and connecting to a hanger in the block wall (RHS.)
Problem is - the top of the wall on the right is a block wall (circa 60/70s). How do i put a hanger in this ? What would you guys recommend and do you agree with my approach for the LHS?
DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!