Hi i am putting an ensuite in, i intend to drop the waste through the floor and create a false ceiling in the corridor below that runs the length of the house. The ensuite will be at the front of the house and mains waste is at the back. The total run is 46ft or 12 meters.
Q1) how much drop over that distance do i need ?
Q2) and/or what is the calculation ?
Many thanks
Martin
DIY how to tutorial projects and guides - Did you know we have a DIY Projects section? Well, if no, then we certainly do! Within this area of our site have literally hundreds of how-to guides and tutorials that cover a huge range of home improvement tasks. Each page also comes with pictures and a video to make completing those jobs even easier!